Shijiazhuang Weitda Prospecting Machinery Co., Ltd. Product DTH Drill Rod Drilling Rig Operation Steps
Classification:
Release time:
2019-08-13

DTH Drill PipeBefore rig work:
It is necessary to check whether the air pipe and oil pipe can be used normally. Check whether the oil tank of the lack of hydraulic oil, oil mist device has no oil. Check whether the lubrication degree of the lubrication part is proper. Check whether the carriage is unobstructed. Check the fixing condition of the rotary machine. Check whether the air pressure of the air compressor is within a reasonable range. Check the traction hook connecting the drilling rig and the compressor, and check whether the hose and safety rope in the main air valve are properly tied. The last step is to check the condition of all hoses and adjust the position of the oiler.
DTH Drill PipeRig in operation:
Connect the drill pipe
1.When the rotary head is lowered to the lowest level, lift the rotary head to make the plate mouth on the drill pipe at the position where the fork plate can be inserted, stop the rotary and feed, and close the impact pressure air.
2.Insert the fork plate into the plate opening of the drill pipe and lower the rotary head so that the positioning surface of the fork is placed on the drill pipe bushing of the centralizer.
3.Use the stop pin to block the fork plate, turn it in the opposite direction, and release the joint.
4.Let the rotary head rotate while slowly lifting until the joint and the drill pipe are completely released. At this time, the drill pipe is suspended on the centralizer by the fork.
5.Grease the drill pipe threads and cover the drill pipe with a thread protection cap.
6.Grease the next drill pipe thread.
7.Usedrill pipeThe hanger covers the male connector end of the drill pipe.
8.Hang the drill pipe hanger with drill pipe on the lug of the connecting rod.
9.Lift the turret until the drill pipe is completely suspended.
10.Turn on the air pressure switch intermittently, and use the airdrill pipeBlowing clean;
11.Remove the thread protection cap, slowly lower the rotary head, slowly rotate forward, and align the female joint end with the male joint end of the previous drill pipe until the upper and lower joints are tightened.
12.Gently lift the swivel head and remove the fork plate.
13.At this point, the rod is completed.
Key words:
Related News
07 Mar,2020
Why Drill Pipe Prices Still Decline
09 Jan,2019
DTH hammer drill pipe new release
09 Jan,2019